Respuesta :
I think it will take it 8 days bcuz 4x8=32 it climbs 5 slides down 1 which is 4
I hope that helped u
I hope that helped u
This question relates to division and the number of days that will be taken to reach the top will be 8 days
Since we're given the information that the spider each day climbs five meters and slides back one meter, that means that it climbs for 4 meters daily.
Therefore, since the spider is climbing up a 30 meter building, the number of days required will be;
= 30/4
= 7.5 = 8 days approximately.
In conclusion, the number of days will be 8 days.
Learn more about division on:
https://brainly.com/question/609683