Respuesta :

The answer is 3 loads
You have 0.2 shifts per 1 load.
You have 5 loads per 1 shift.
So you have 3 loads for 8 quarters.
0.2 x 5 = 1
1 x 3 = 3. So the answer is 3 loads.