HELP ASAP WITH MATH DECIMALS!!! I WILL UPROVE!!!

At the toy factory, toy cars are produced on an assembly line. It takes 8.216 seconds to attach the wheels. 3.652 seconds to attach the hood.

How long does it take to attach the wheels and hood 425 toy cars?


________seconds

Respuesta :

Kisaf
Total time taken to attach the wheels and hood to a car = 8.216 + 3.652 = 11.868 seconds

Total time taken to attach good and wheels to 425 cars = 11.868 x 425 = 4925.22 seconds


Ans. 4925.22 seconds