Except completion time a project manager can estimate probability of all other activities that need to complete a task.
The term "COMPLETION TIME" refers to the time frame, as of the date specified in the acceptance of tender, for delivering the constructed machinery or equipment that has been approved by the engineer as meeting the requisite standards and the terms of the contract.
The design-basis mitigation function of the affected systems has not been altered by the proposed revisions, and the implications of an accident during the extended Completion Time are the same as those during the current Completion Time.
As a result, the proposed adjustments do not constitute a material increase in the likelihood or effects of an accident that has already been assessed.
Learn more about completion time here:
https://brainly.com/question/20164920
#SPJ1