Now consider machining jamming caused by both defective parts jamming and station malfunction. Assume component lot quality is at the level of 1/4 percent defective, what is the production rate? Can the production quota of 2,500 units per eight-hour shift be met? What is the percent downtime? What is the efficiency of this line? What is the throughput time?

Respuesta :

Please find full question attached Answer:

C. production rate =2873 units per 7.8hrs

Production rate of 2500 units per 8 hours can be reached.

Percent Down time = 2.5%

Efficiency of line = 114.92%

Throughput time = 7.8 hrs

Explanation:

Please find explanation attached