Answer:
Fabrication, $420,000 / 3,000 = $140 per hour
Assembly, $180,000 / 3,000 = $60 per hour
speedboats
bass boats
a. Determine the total number of budgeted direct labor hours for the year in each department.
3,000 labor hours in Fabrication and 3,000 labor hours in Assembly
b. Determine the departmental factory overhead rates for both departments.
Fabrication = $140 per hour
Assembly = $60 per hour
c. Determine the factory overhead allocated per unit for each product using the department factory overhead allocation rates.
speedboats
bass boats