Answer:
$40
Explanation:
The computation of the cost of materials handling per coffee table is shown below:
= Number of parts × rate per part
= 20 separate parts × $2
= $40
In order to find out the cost of material handing, we multiplied the number of parts with the rate per part so that the actual cost could have come
Note:This is the answer but the same is not provided in the given options