Jones Company uses a job-order costing system with a predetermined overhead rate of 120. What is the purpose of the predetermined overhead rate in a job-order costing system?
1) To allocate overhead costs to individual jobs
2) To determine the direct labor cost per unit
3) To calculate the total manufacturing cost
4) To determine the selling price of the product