zepol company is planning to produce 600,000 power drills for the coming year. the company uses direct labor hours to assign overhead to products. each drill requires 0.75 standard hours of labor for completion. the total budgeted overhead was $1,777,500. the total fixed overhead budgeted for the coming year is $832,500. predetermined overhead rates are calculated using expected production, measured in direct labor hours. actual results for the year are: line item description numerical data actual production (units) 594,000 actual direct labor hours (ah) 446,000 actual variable overhead $928,000 actual fixed overhead $835,600 required: 1. compute the applied fixed overhead.