following are simplified job cost sheets for three custom jobs at the end of june for custom patios. job number 102 materials $ 30,000 labor 13,000 overhead 5,720 job number 103 materials $ 53,000 labor 27,500 overhead 12,100 job number 104 materials $ 46,000 labor 43,000 overhead 18,920 all jobs were started in june. overhead is applied with a predetermined rate based on direct labor cost. jobs 102 and 103 were finished in june, and job 104 will be finished in july. 1. what was the total cost of direct materials requisitioned in june? 2. how much total direct labor cost was incurred in june? 3. how much total cost is transferred to finished goods inventory in june?